Construction

Before the
first bolt
is turned.

Every GC uses a Pre-Task Plan. Cyamate reads it and verifies every worker understands what they're about to do — automatically, every morning, before work begins.

OSHA admissible
PTP integrated
Procore sync
English & Spanish
Assessment record — live
Cyamate · Verified Knowledge Record
GC Admissible
Marcus T. Williams
Ironworker · Site B · Meridian Builders · Apr 4 2026
Green — cleared
Fall protection — OSHA 1926.502Aerial lift active today · 4 follow-ups
94%
4m 12s
Scaffold safety — 1926 Subpart LScaffold in use · 3 follow-ups
91%
3m 44s
Struck-by awareness — OSHA 1926Adjacent crane operations · 2 follow-ups
88%
3m 18s
3 modules · 11m 14s · OSHA 1926
Synced → Procore Documents
The PTP workflow

One form.
Everything automatic.

Cyamate plugs into the Pre-Task Plan your foreman already fills out every morning. No new process. No new app. Just verified knowledge as an output of the workflow you already run.

01
Foreman submits the daily PTP
Work steps, tools, hazards, high-risk activities. 3 minutes. Edits from yesterday. Digital, tablet-first, QR crew sign-off.
02
Cyamate fires targeted assessments
Aerial lift flagged? Those workers get aerial lift questions. Confined space permit? Those workers get confined space questions. Questions matched to today's actual work — not a generic quiz.
03
Workers assess in 4 minutes on their phones
AI asks, probes, teaches where gaps exist, reassesses, confirms understanding. English or Spanish. No app download required.
04
GC dashboard updates. Red flags email instantly.
Transcript stored. Procore Observation created automatically. OSHA-ready before the first task starts.
Flag system

Red. Yellow.
Green.

Configurable per company. Informed by your safety directors and the GCs you work with.

Green — cleared for work
Worker demonstrated clear understanding across all assessed topics. Transcript generated and stored. Work begins.
Yellow — coached, cleared with follow-up
Knowledge gap found and corrected in session. Worker cleared but flagged for re-assessment before next shift on that topic. Supervisor notified.
Red — supervisor action required
Significant gap on a safety-critical topic. Work paused. Superintendent email triggered. Procore Observation created. Supervisor must acknowledge before work resumes.
Assessment blast
Safety directors can push a targeted assessment to any group at any time — all PMs on a topic, all subs after a near miss, site-wide after an incident. Verified, documented, defensible.
Integrations

Lives inside
Procore.

Your safety director never leaves their existing system. Cyamate data flows directly into Procore — transcripts, observations, and worker directory sync happen automatically.

See Procore demo
Procore integration — live Q3 2026
Transcripts → Procore Documents
Every completed assessment uploads automatically to the project's document folder. Timestamped, linked to worker, searchable from within Procore.
Red flags → Procore Observations
Automatically assigned to the superintendent. Notification routing follows your existing Procore workflow. No new process.
Worker directory → PTP form
Crew list auto-populates from Procore. No manual entry. Workers matched to projects automatically.
Pricing

Simple pricing.
No surprises.

Priced by how your business actually works — GC seats, active job sites, and worker profiles are always free.

General contractor
$19
Per superintendent or PM seat / month
Safety dashboard always free
Daily PTP sender. Every super gets one.
  • Create and submit daily Cyamate form
  • Auto-trigger targeted assessments
  • Real-time crew status on mobile
  • Red / Yellow / Green flag alerts
  • Full transcript access
Book a demo
Most common
Subcontractor growth
$99
Up to 5 active job sites / month
Growing subs running multiple jobs.
  • Everything in Starter ($29/mo, 1 site)
  • Multi-site dashboard
  • Flag history and knowledge trends
  • Liability transcript library
  • Training recommendations per worker
Book a demo
GC analytics upgrade
$299
Per site / month · safety dashboard free
Safety directors managing multiple sites.
  • Cross-site knowledge gap trends
  • Custom flag rubric per company
  • Procore + BIM 360 sync
  • Sub performance benchmarking
  • Audit-ready export package
Book a demo
ROI check: One OSHA serious violation = $16,131. Starter costs $348/year — 46× cheaper than a single fine. · Worker profile is always free. · No contracts. Cancel anytime.
"The transcript alone saves us from potential seven-figure exposure."
Beta customer — Regional general contractor
Construction

Proof before
work begins.

15 minutes. We'll show you the PTP workflow live and walk through what your liability transcript looks like.